WRIKE

Client:WRIKE
Flat:2500 m2
Realization:2020-03–10

Activities:


Sector:
  • Administration

WRIKE

Construction of office space for the client WRIKE in the new DOCK 04 building on three floors (3rd, 4th and 5th floors). SIS was the general contractor for this project and was responsible of the supply and installation of all elements except furniture and AV equipment. The project comprised the modification and installation of low-current and high-current cabling, incl. MAR, ERO and EPS, as well as modifications and new distribution of air conditioning, cooling and heating. New plasterboard installations and ceilings. Also part of the social facilities within the fit-out was adjusted compared to the original building standard.

Several SIS divisions were also involved in the construction, such as CLARUS glass partitions and floor coverings including MODULYSS carpet tiles and vinyl flooring.




Other references from the same category

Contact

Created 2018 by SEO optimalizace s.r.o. | Všechna práva vyhrazena.

SEO optimalizace